Engine To Frame Ground - Polaris RZR 570 2013 Service Manual

Table of Contents

Advertisement

MAINTENANCE
w
6. Inspect electrodes
Look for a sharp outer edge with no rounding or
erosion of the electrodes.
7. Clean with electrical contact cleaner only.
8. Measure gap with a wire gauge. Adjust gap
necessary by carefully bending the side electrode.
9. If necessary, replace spark plug with proper type.
CAUTION
Severe engine damage may occur if the incorrect spark
plug is used.
10. Install spark plugs and torque to specification.
Recommended Spark Plug:
2013-2014: Champion XG4YCX
2015 and later: NGK MR7F
TORQUE
Spark Plug:
9 ft-lbs (12 Nm)
11. Install spark plug wire into spark plug / engine.
12. Reinstall cargo box access panel.
13. Reinstall the (-) negative battery cable and driver's
seat.
2.36
for wear and carbon buildup.

ENGINE TO FRAME GROUND

Inspect ground cable connections. Be sure they are
clean and tight.
The engine ground cable
motor mounting bolt to the chassis ground terminal.
The Chassis ground
near the starter solenoid.
e
if
9926813 R04 - 2013-2016 RZR 570 Service Manual
q
runs from the upper starter
w
is located under the drivers seat,
© Copyright Polaris Industries Inc.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rzr 570 2014Rzr 570 2015Rzr 570 2016

Table of Contents