Polaris RZR 570 2013 Service Manual page 154

Table of Contents

Advertisement

ENGINE / COOLING SYSTEM
BALANCE SHAFT INSTALLATION / TIMING
1. Position balance shaft in the crankcase.
2. Rotate crankshaft to align the timing marks
shown below.
3. Fully seat the balance shaft into the crankcase and
verify timing marks are correct.
3.82
FINAL CRANKCASE ASSEMBLY
1. Prepare lower crankcase by cleaning sealing
surface. Be sure the oil pickup and oil pressure valve
q
as
are fully installed.
2. Apply a thin film of Crankcase Sealant (PN 2871557)
evenly to a clean and oil-free crankcase mating
surface as indicated below
w
pins
are in place.
3. Carefully
crankcase immediately. Do not allow sealant to dry.
4. Tap crankcase evenly until fully seated with a soft
sided hammer.
5. Install the new crankcase bolts finger tight in MAG
side crankcase.
6. Tighten all bolts evenly until snug.
q
. Be sure alignment
Crankcase Sealant:
PN 2871557
assemble
MAG
crankcase
9926813 R04 - 2013-2016 RZR 570 Service Manual
© Copyright Polaris Industries Inc.
to
PTO

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rzr 570 2014Rzr 570 2015Rzr 570 2016

Table of Contents