Engine To Frame Ground; Steering; Steering Inspection - Polaris 2012 RANGER RZR 570 INTL Service Manual

Table of Contents

Advertisement

Engine To Frame Ground

Inspect ground cable connections. Be sure they are clean
and tight.
The engine ground cable runs from the upper starter motor
mounting bolt to the chassis ground terminal.
The Chassis ground is lo cated under the dr ivers seat, near
the starter solenoid.
Chassis
Ground Terminal
Engine
Ground Cable
9923523 - RANGER RZR 570 Service Manual
© Copyright 2011 Polaris Sales Inc.

STEERING

Steering Inspection

The steering components should be checked periodically
for lo ose fa steners, wor n tie ro d e nds, b all jo ints, and
damage. Also ch eck to make sure all co tter pin s ar e in
place. If cotte r p ins are re moved, they mu st no t be re–
used. Always use new cotter pins.
Replace any wor n or da maged steer ing com ponents.
Steering should move freely through the entire range of
travel without binding. Check routing of all cables, hoses,
and wirin g to b e sur e the steer ing mech anism i s n ot
restricted or limited.
NOTE: Whenever s
teering c
replaced, check front end alignment.
WARNING
Due to the critical nature of the procedures
outlined in this chapter, Polaris recommends
steering component repair and adjustment be
performed by an authorized Polaris
MSD certified technician.
Use only genuine Polaris replacement parts.
MAINTENANCE
omponents are
2.33
2

Advertisement

Table of Contents
loading

Table of Contents