Polaris RZR 570 2013 Service Manual page 251

Table of Contents

Advertisement

12. Loosen the three clamps securing the intake baffle
assembly to the air box lid, inner clutch cover and
engine crankcase vent. Remove the air intake baffle
/ intake hoses / engine crankcase vent tube an
assembly as shown below.
13. Remove the outer clutch cover, drive belt, drive
clutch, driven clutch and inner clutch cover (see
Chapter 6 – PVT Disassembly, page 5.8). Make note
of hose and wire routings for reassembly.
NOTE
Be sure to use the correct Drive Clutch Puller (PN PA-
48595) to prevent damage to crankshaft.
14. Loosen the hose clamp that secures the air box to
the throttle body. Cut the tie strap that secures the
wire harness to the right-hand side of the air box.
Remove the air box assembly.
9926813 R04 - 2013-2016 RZR 570 Service Manual
© Copyright Polaris Industries Inc.
15. Place a shop to beneath the fuel line quick connector
to catch any excess fuel. Disconnect the fuel line
from the fuel rail by pressing in on the quick
connector tabs. Move fuel line to the left-hand side of
the engine compartment. Make note of line routing
for installation.
16. Disconnect the IAC valve (A), TPS (B), T-MAP
sensor (C), harness leads from the throttle body.
17. Remove throttle body from the engine and wrap it
with a clean shop towel. Place throttle body on the
LH side frame rail area.
NOTE
Be sure dirt and debris do not enter the engine, air box
or throttle body. Use clean shop towels to plug engine
and air box intake holes.
TRANSMISSION
6
6.7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rzr 570 2014Rzr 570 2015Rzr 570 2016

Table of Contents