Polaris RZR 570 2013 Service Manual page 311

Table of Contents

Advertisement

5. Install
the
upper
pinch
specification.
TORQUE
Ball Joint Pinch Bolts:
23 ft-lb (31 Nm)
6. Apply grease to drive shaft axle splines.
7. Install front wheel hub assembly, cone washers, and
hand tighten the castle nut. Install washers with
domed side out.
9926813 R04 - 2013-2016 RZR 570 Service Manual
© Copyright Polaris Industries Inc.
bolt
and
torque
to
8. Torque wheel hub nut to specification and install a
9. Install brake caliper mounting bolts and torque to
destroyed upon removal. Always use new brake caliper
10. Install wheel and four wheel nuts. Torque wheel nuts
11. Rotate wheel and check for smooth operation. Bend
new cotter pin. Tighten nut slightly if necessary to
align cotter pin holes.
TORQUE
Front Wheel Hub Castle Nut:
80 ft-lb (108 Nm)
specification.
TORQUE
Front Caliper Mounting Bolts:
30 ft-lbs (41 Nm)
CAUTION
New bolts have a pre-applied locking agent which is
mounting bolts upon assembly.
to specification.
TORQUE
Wheel Nuts:
Steel Rims: 27 ft-lbs (37 Nm)
Aluminum Rims: 30 ft-lbs (41 Nm) + 90°
both ends of cotter pin around end of spindle in
different directions.
FINAL DRIVE
7
7.13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rzr 570 2014Rzr 570 2015Rzr 570 2016

Table of Contents