Option Connection Diagram; Electrical Interference Countermeasures; Communication Cable Topology - YASKAWA LonWorks SI-W3 Installation Manual

Hide thumbs Also See for LonWorks SI-W3:
Table of Contents

Advertisement

5 Installation Procedure

Option Connection Diagram

*1
If there is electrical interference in the communication signals, install an EMI/RFI filter to the input lines
and a zero-phase reactor to the output lines. Refer to
for more information.
*2
Connect the included ground wire for installations on 1000-series, HV600, and FP605 drives.
The ground wire is not necessary for installation on GA700 or GA800 drives.
*3
Do not connect the shield line directly to the SLD terminal or the drive ground terminal. Failure to obey can
cause electrical interference.

Electrical Interference Countermeasures

If there is electrical interference in the communication signals, install an EMI/RFI filter to
the input lines and a zero-phase reactor to the output lines.
Refer to the appropriate drive catalog for information on selecting the correct EMI/RFI
filter for the input line and zero-phase reactor for the output line.
Filter Install Location
Main circuit (input)
Main circuit (output to
motor)

Communication Cable Topology

Use only a dedicated LonWorks communication cable.
Route the option wiring as specified by these procedures.
42
Figure 5.28 Option Connection Diagram
Filter Type
Noise filter
Zero-Phase Reactor
Electrical Interference Countermeasures on page 42
Series/Part Number
LNFD series
F6054GB, F11080GB, F200160PB
YASKAWA TOEP C730600 93B LonWorks Installation Manual