YASKAWA LonWorks SI-W3 Installation Manual page 61

Hide thumbs Also See for LonWorks SI-W3:
Table of Contents

Advertisement

Figure 10.4 Option Installation for CE Compliance: FP605
3.
Ground the largest possible surface area of the shield to the metal panel.
Yaskawa recommends using cable clamps.
A - Braided shield cable
B - Metal panel
YASKAWA TOEP C730600 93B LonWorks Installation Manual
C - Cable clamp (conductive)
Figure 10.5 Ground Area
10 European Standards
61

Advertisement

Table of Contents
loading

Table of Contents