Installation - Thermo Scientific MaxQ SHKE8000 Series Operating And Maintenance Manual

Stackable orbital shakers
Hide thumbs Also See for MaxQ SHKE8000 Series:
Table of Contents

Advertisement

Thermo Scientific

Installation

Section 1
The shipping carton should be inspected upon delivery. When received,
carefully examine for any shipping damage before unpacking. If damage is
discovered, the delivering carrier should specify and sign for the damage
on your copy of the delivery receipt.
Open the carton carefully making certain that all parts are accounted for
before packaging materials are discarded. After unpacking, if damage to
any of the contents is found, promptly report it to the carrier and request a
formal damage inspection.
Important Failure to request an inspection of damage within a few days
after receipt of shipment absolves the carrier from any liability for damage.
Call for a damage inspection promptly.
MaxQ SHKE8000 Series Stackable Orbital Shakers are shipped with the
following materials:
4 - Foot pads
4 - Painted 1½" spacer blocks
4 - 5/16-18 x 4" hex bolts
4 - 5/16" lockwashers
1 - T-handle 5/32" hex wrench
1 - Removeable shaker platform
6 - Grade 8, 5/32" hex socket flat head screws (with platform)
2 - 7/16" Open end wrench
2 - ¾" open end wrench
1 - 8¾" Phillips screwdriver for flask clip installation and removal
1 - Line cord (country of destination)
Figure 1-1. Model SHKE8000 Incubated Stackable Orbital Shaker
Actual
START
Setpoints
(arrow
STOP
Silence
keys)
Time
Speed
Temp °C
Light
Switch
rbital Shaker
Power
Switch
MaxQ SHKE8000 Series Shakers
1-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Shke8000Shke8000-1ceShke8000-7Shke8000-8ce

Table of Contents