Stacking Units On A Stand - Thermo Scientific MaxQ SHKE8000 Series Operating And Maintenance Manual

Stackable orbital shakers
Hide thumbs Also See for MaxQ SHKE8000 Series:
Table of Contents

Advertisement

Single or Base Unit
on Stand (continued)
Stacking Units on a
Thermo Scientific
5. Carefully lift and position the unit over the spacers on the stand. Align
the (4) connection point holes in the bottom of the unit with the (4)
spacers and holes in the stand. (Helpful hint: Use masking tape around
outside edge of spacers to hold in place during installation. Remove
tape after installation.)
6. Assemble the lockwashers, then the D-shaped flatwashers onto the
½"-13 x 4" bolts. Then thread the bolts through the underside of the
stand top rails, through the spacers and into the holes in the bottom of
the unit. Tighten these bolts to secure the shaker to the stand. Refer to
Figure 1-13 and 1-14.
bottom left corner
of shaker
1 in. spacer
4 in. bolt
D-Flatwasher
Lockwasher
top left corner
of stand
Figure 1-13. Shaker To Stand
7. Level the stand. Refer to the Leveling the Stackable Shaker section of
this manual.
The stacking of two units can be accomplished from the front of the unit.
To access the stacking connection points needed to secure one unit to
Stand
another, remove the front kick panel of the top unit (Figure 1- 15). If
access to the rear of the unit is possible in it's final position, the back cover
plate can be removed for easier access to connection points. See Figure 1-
16. Re-install back cover plate after stack is secure.
Figure 1-14. Single Shaker on Stand
MaxQ SHKE8000 Series Shakers
Section 1
Installation
1-7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Shke8000Shke8000-1ceShke8000-7Shke8000-8ce

Table of Contents