Thermo Scientific MaxQ SHKE8000 Series Operating And Maintenance Manual page 16

Stackable orbital shakers
Hide thumbs Also See for MaxQ SHKE8000 Series:
Table of Contents

Advertisement

Section 1
Installation
Stacking Units on a
Stand (continued)
Figure 1-17. Remove Four Screws (top unit)
1-8
MaxQ SHKE8000 Series Shakers
Figure 1-15. Kick Panel on Front of Unit (middle or top unit)
Figure 1-16. Cover Plate on Back of Unit
1. For easier access to stacking connection points on the top unit, the
four screws on the front of the relay box bracket may be removed
(Figure 1-17). The relay box can be pushed carefully back
approximately an inch or pulled carefully outward to access the back
connection point. The stacking hardware may then be installed as
follows. When the stack has been secured, pull the relay box forward
and reinstall the four screws.
Connection point
2. Place the 1-1/2 inch tall spacers (Figure 1-18) over
the threaded inserts in the top four corners of the
bottom unit (Figure 1-10).
3. Using the appropriate lifting device, carefully raise
the unit to be stacked and remove all (4) the
leveling feet.
Tabs
Connection point
behind relay box
Connection point
Remove four
screws
Figure 1-18. Spacer
Thermo Scientific

Advertisement

Table of Contents
loading

This manual is also suitable for:

Shke8000Shke8000-1ceShke8000-7Shke8000-8ce

Table of Contents