Single Or Base Unit On Stand - Thermo Scientific MaxQ SHKE8000 Series Operating And Maintenance Manual

Stackable orbital shakers
Hide thumbs Also See for MaxQ SHKE8000 Series:
Table of Contents

Advertisement

Section 1
Installation
Positioning (continued)
Single or Base Unit
on Stand
1-6
MaxQ SHKE8000 Series Shakers
Caution Do not lift with forklift or other lifting device near the center of
the unit base. Damage to the shaker mechanism mounting may occur.
When lifting from the base, position the lifting device as close as possible
to the leveling feet. Whenever possible, lift the unit by the four threaded
inserts (Figure 1-10). Do not attempt to lift two units by the threaded
inserts. The inserts are provided to lift and position only one unit at a
s
time.
Figure 1-10. Exterior Top of Unit
Make sure unit is turned off and disconnected from the power source.
1. To install a single unit, or the base unit of a stack, first position the
stand in its final location.
2. Assemble the neoprene pads to the bottom of each of the leveling feet
(Figure 1-11).
3. Place a 1 inch tall spacer over each hole on the top four corners of the
stand. Refer to Figure 1-12.
Leveling foot
Neoprene pad
Figure 1-11. Leveling Feet
4. Using the appropriate lifting device, carefully raise the unit to be
stacked and remove all (4) leveling feet.
Threaded inserts
5/16"-18
1"
Figure 1-12. Spacer
Thermo Scientific

Advertisement

Table of Contents
loading

This manual is also suitable for:

Shke8000Shke8000-1ceShke8000-7Shke8000-8ce

Table of Contents