GE Senographe 2000 D Operator's Manual page 143

Acquisition system
Table of Contents

Advertisement

GE Healthcare
REV 1
2.
RECOMMENDED PLANNED MAINTENANCE
To ensure safe and effective operation of the equipment, planned maintenance procedures should be
carried out at the intervals specified.
2-1
Planned maintenance performed by the Radiologic Technologist
This consists of simple Quality Control (QC) tests which ensure that the system is operating to its
design standards.
Frequency: from daily to semi-annually, depending on the task.
Procedures: please refer to the Senographe 2000 D QC Manual.
2-2
Planned maintenance performed by the Medical Physicist
This consists of QC tests performed by the Medical Physicist to ensure that the system provides a
high level of mammographic quality.
Frequency: annually.
Procedures: please refer to the Senographe 2000 D QC Manual.
2-3
Planned maintenance performed by the Field Service Engineer
Planned maintenance (PM) should be performed twice a year by a GEMS Service Representative or
similarly qualified and trained personnel.
A complete day is necessary on each occasion. The procedures and their frequency are listed below.
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
On–site preliminary:
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Analyze system logs
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Acquisition Backup
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Inspection and functional checks:
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Check Emergency Stop Buttons
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Check Cable Grounding
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Inspect Radiation Shield
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Check power–Off/On Sequences
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Generator checks and calibration:
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Check Generator Calibration
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Check HV unit
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Check the Half–Value layer Measurement
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Check kVp settings
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Check mA and mAs settings
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Change Generator CPU battery
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Clean Conditioner air filter
Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó Ó
Senographe 2000 D Acquisition System
Task
141
OM 5179217–1–100
Ó Ó Ó Ó Ó Ó Ó
Interval (months)
Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó
6
Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó
12
Ó Ó Ó Ó Ó Ó Ó
12
Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó
24
Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó
24
Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó
12
Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó
12
Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó
12
Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó
12
Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó
12
Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó
12
Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó
36
Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó
Ó Ó Ó Ó Ó Ó Ó
12
Ó Ó Ó Ó Ó Ó Ó

Advertisement

Table of Contents
loading

Table of Contents