Section 3: Installation
February 2018
3.6.3

Network Controlled

For the actuator to be network controlled, a Controlinc ACM and a Communication
Adapter Module (CAM) must be installed. Each CAM is required for a specific
protocol and network topology, and enables the network capability. To install the
Controlinc ACM see Section 3.6.1, Wiring the ACM.
NOTE:
Factory personnel must install the ACM and CAM. These modules (CAMs) may be
installed in the field only by factory-trained technicians using a special passcode to
enter the "FACTORY SETUP" mode.
Connect the actuators as shown in Table 3-1 for RS-485 redundant bus or E>Net
networks. If another protocol is selected then refer to the wiring diagram supplied
with the actuator for connections.
NOTE:
If E>Net network topology is specified, insert a jumper between Terminals 40 and
42 to connect the network cable shield throughout the network and connect a
single point earth/ground elsewhere.
See Section 3.3, Electrical Connections for general electrical
connection requirements.
Table 3-1.
22
All manuals and user guides at all-guides.com
Connecting Actuator A to Actuator B
Terminal Block
39
41
40
43
44
42
Installation and Operation Manual
E2K-405-0218 Rev. 2
Function
Data Port A (+)
Data Port A (-)
Shield
Data Port B (+)
Data Port B (-)
Shield