Chroma 63200 Series Operation & Programming Manual page 44

High power dc electronic load
Hide thumbs Also See for 63200 Series:
Table of Contents

Advertisement

High Power DC Electronic Load 63200 Series Operation & Programming Manual
You can program two different static settings, A and B under all static CC, CR, CV, and CP
modes. Both A and B states use the same range. You can select A or B through the
key. Slew rate determines the rate that Load level changes from one state to another.
Figure 3-4 shows the load current level after pressing
CCLA: 4A, CCLB:2A, CCL
Current
4A
2A
Dynamic load operation enables you to program two load levels (CCDL1, CCDL2), load
duration (CCDLT1, CCDLT2), and slew rate (CCDL
switched between those two load levels according to your specific setting during operation.
The dynamic load is commonly used to test the UUT's performance under transient loading
condition. Figure 3-5 shows current waveform of dynamic function.
CCDL1:4A, CCDL2:2A, CCDL
CCDLT1:10mS, CCDLT2:10mS
Current
4A
2A
3-6
: 0.2A/µS, CCL
rise slew rate
10uS
25uS
Figure 3-4 Load Level after Pressing
:1A/µS, CCDL
10mS
10mS
T1
T2
Figure 3-5 Dynamic Current Waveform
key.
A/B
: 0.08A/µS
fall slew rate
press key "A/B"
A/B
, CCDL
: 1A/µS,
10mS
10mS
T1
T2
State A
State B
Time
Key
). The loading level is
Load1
load2
Time
A/B

Advertisement

Table of Contents
loading

This manual is also suitable for:

632016320263203632046320563206 ... Show all

Table of Contents