4.12
Example of Controller Operation, Using External Signals
(1) Normal operation sequence
POWER
(I)
SYS_RDY
(O)
SV_RDY
(O)
Approx. 1 sec.
EX_SVON
(I)
SVOFF
(I)
SVST_A
(O)
~SVST_B
Program selection
(I)
STROBE
(I)
ACK
(O)
RUN
(I)
CYCLE
(I)
STOP
(I)
AUTORUN
(O)
CYC_END
(O)
1
Set ON the RUN signal only after the SV_RDY signal is ON.
2
Include a sufficient delay time before the program select signal starts between
the program select signal input and STROBE signal input. (200 msec or so)
2
1
– 83 –
INTERFACE MANUAL
2
STE 80729