KidKraft BEAR CAVE LODGE Installation And Operating Instructions Manual page 114

Playset
Table of Contents

Advertisement

Step 61: Attach Tunnel Assembly Frame to Fort
Part 2
E: From underneath the tunnel place 1 Swing Bracket on each end of the (6036) Tire Joist. Pre-drill holes using
a 1/8" drill bit and connect to the structures using 2 (WL3) 1/4 x 1-3/8" Wafer Lags (with flat washers) per side.
(fig. 61.4)
Fig. 61.4
Underneath View
6036
WL3
Hardware
4 x
1/4 x 1-3/8" Wafer Lag (1/4" flat washer)
WL3
114
1/4" Flat
Washer
Other Parts
2 x Swing Bracket

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

F24872

Table of Contents