Knoll Antenna Workspaces Installation Instructions Manual page 63

Table of Contents

Advertisement

Electrical Components: Communications Mounting Box
Pattern Number Represented:
Communications Mounting Box,
Tops
Parts List:
Data Box (A)
Rod Weldment (B)
Spring Nut (C)
M6 x 14mm Machine Screw (D)
/
–18 x ¾" Machine Screw (E)
5
16
Center Beam (or)
Power Harness Mounting Bracket for Desks
Tools Needed:
Drill
Phillips #2 and #3 bits
STEPS:
1. Insert (2) spring nuts (C) into the bottom
slot in the center beam of the Big Table
or in the Power Harness Mounting
Bracket for Desks at desired location.
2. Fasten the rod weldment (B) to the spring nuts
using (2) M6 x 14mm machine screws (D).
3. Attach the data box (A) to the weldment rod
using a
/
-18 x ¾" machine screw (E).
5
16
4. Install communication faceplates and
data modules, provided by others, by
snapping into the front and/or back
knockout of the data box, as required.
YR1CMB
Supports
The mounting box has industry standard
decora-size openings for outlets facing
the inside or outside of the desk, and an
opening underneath for cable supply.
A B X Y
(A) 3AB5035*
(B) 3AB8019*
Electrical
Electrical
(D) 3AB405640
(E) 7060440
(C) 3AB402196
Fence
A B X Y
Desk Rail with 12" W Power Harness
and Communications Mounting Box
Center Beam with
12"W Power Harness
and Communications
Mounting Box
A B X Y
Center Beam with 12"W Power Harness
and Communications Mounting Box
Center Beam with
24"W Power Harness
and Communications
Mounting Box
Desk Rail w
Power Har
A
Desk Rail w
Power Har
Desk Rail w
Power Har
Communic
Mounting B
Desk Rail w
Power Har
Communic
Mounting B

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Knoll Antenna Workspaces

Table of Contents