HYDRAULIC SYSTEM
pressure for a minimum of 10 seconds. Visually check
for internal and external leakage. No internal or external
leakage is permitted.
5.
Fully extend the cylinder rod. Keep the rod port open.
Apply test pressure (Table 4-10) to the base port. Hold
this pressure for a minimum of 10 seconds. Visually
check for internal and external leakage. No internal or
external leakage is permitted.
6.
Retract rod and put plugs in the cylinder ports to keep
out dirt during installation.
4-46
Installation
1.
2.
3.
4.
Published 04/07/2015 Control # 569-00
Install the cylinder on the machine using the correct
mounting hardware.
Connect the hydraulic lines.
Lubricate the cylinder pivot grease fittings with
recommended grease.
Check hydraulic oil level in the hydraulic oil reservoir.
Add oil if necessary.
CD3340B/YB4411
Need help?
Do you have a question about the Grove CD3340B and is the answer not in the manual?
Questions and answers