STRUCTURAL
9.
Install a new seal (4), O-ring (12) into the bearing carrier
(11). Install bearing (5) into the bearing carrier
(Figure 11-41). Grease the O-ring on the bearing carrier
(Figure 11-42) and install the bearing carrier into the
drum. It must be installed with the O-ring nearest the
motor end.
P0194
P0193
10. Place the brake section into the hoist bracket
(Figure 11-43). Make sure that the pilot of the brake
section aligns with the bore in the bearing carrier and
that the bolts for the motor are aligned properly. Install
the mounting capscrews and tighten to a torque of 130
to 143 Nm (100 to 110 lb-ft). Also, make sure that the
level and vent plugs (Figure 11-43) in the cover are
properly oriented.
11-24
11. Install a new O-ring (17, Figure 11-33) on the face of the
FIGURE 11-41
12. Fill both the gearbox and the brake section with the
Motor Group
1.
FIGURE 11-42
2.
3.
Published 04/07/2015 Control # 569-00
Brake
p0830
motor and install the motor/brake valve assembly and
connect the hoses.
proper amount and type of lubricant. See table in
Section 5.
Tag the hoses for proper installation and remove them
from the motor and brake valve.
P0813
Remove the brake valve from the motor. See
Figure 11-44.
Remove the cartridge from the brake valve and inspect
the metering hole (Figure 11-45) to make sure it is not
obstructed. Also, check the O-rings to ensure that they
are not cut or flattened. Replace if necessary.
CD3340B/YB4411
Vent Plug
FIGURE 11-43
FIGURE 11-44
Need help?
Do you have a question about the Grove CD3340B and is the answer not in the manual?
Questions and answers