After First 50 Hours Of Operation (New Cranes); Cranes Not In Regular Use; Preventive Maintenance; Maintenance Schedule And Checklist - Manitowoc Grove 5540F Service Manual

Hide thumbs Also See for Grove 5540F:
Table of Contents

Advertisement

PREVENTATIVE MAINTENANCE
Winch Gearbox
 
Check oil level. Fill if level is low.
Tires
 
Check for correct air pressure.
 
Wire rope cable clamps and connections
Check for loose or missing parts.
 
Anti-Double Blocking System
 
Check that the system is working properly.
Controls
 
Check that all controls are working properly.
 
After First 50 Hours of Operation
(New Cranes)
 
Engine
 
Change the engine oil and filter.
 
Transmission
Change the transmission oil filter.
 
Swing Gearbox
 
Check and tighten mounting bolts.
Hoist Gearbox
 
Check and tighten mounting bolts.
 
Swing Gear Pinion and Swing Gear
Lubricate.
 
Grease Fittings
 
Apply grease to all grease fittings.
Boom Slides
 
Lubricate.
 
Wheel Mounting Nuts
Check Torque.
 
 
 
 
 
 
 
5-2

Cranes Not In Regular Use

A crane which has been idle for a period of one month or
more, but less than six months, it must be given an
inspection by a qualified person. This person should use the
daily through monthly inspections.
A crane which has been idle for a period of over 6 months
must be given a complete inspection covering all inspections
through one year, by a qualified person.
Standby cranes must be inspected using the daily through
monthly inspection, by a qualified person.

PREVENTIVE MAINTENANCE

Maintenance Schedule and Checklist

NOTE:
NOTE:
NOTE:
Published 10-21-2010, Control# 198-04
5540F/YB5515 SERVICE MANUAL
Hour intervals in each maintenance chart show the
correct time for service. The hourmeter located in
the operator's cab indicates the total hours the
crane has been running.
In addition to the following scheduled maintenance,
perform the scheduled maintenance suggested in
the engine manual furnished with the crane.
When performing maintenance, do the required
maintenance interval as well as all previous interval
maintenance. For example, when performing the
250 hour (monthly) maintenance interval, perform
all the tasks required for daily, 50 hour and 100
hour maintenance.
 
 

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Grove 5540F and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Grove yb5515

Table of Contents

Save PDF