Commissioning

8.1 Commissioning checklist

8.1
Commissioning checklist
Preparation
● Read the safety instructions in Chapter "Safety instructions (Page 17)".
● Read Chapter "Transport, unpacking, installation (Page 39)".
● Read through the entire checklist together with another person before starting work on
the device.
● Before commissioning the converter, as a minimum, check the following points:

Mechanical installation

Use the following checklist to guide you through the mechanical installation procedure for the
device.
Note
Checking the checklist
Check the boxes accordingly in the right-hand column if the activity applies to the cabinet
unit in your scope of supply. In the same way, check the boxes once you have finished the
installation procedure to confirm that the activities are complete.
Item
Activity
1
The device is properly mounted on a vertical wall/panel made of non-flammable
material.
2
All shield connections are tight (see Chapter "Connecting (Page 55)").
3
All cable connections are tight (see Chapter "Connecting (Page 55)").
4
The ambient conditions are complied with (see Chapter "Environmental conditions
(Page 37)").
5
The cooling air can flow unobstructed.
6
The motor and the driven machine are ready to run.
236
Available
SINAMICS DCM Control Module
Operating Instructions, 12/2018, A5E34888669A
Completed