7
PARAMETER SETTING
This chapter uses GX Works3 for explanations.
7.1

Network Configuration Setting

For the setting procedure for the master station, refer to the following.
 User's manual for the master/local module used
Setting procedure
A profile is required for each of the model names of the modules to be used.
Operating procedure
1.
Open the "CC IE Field Configuration" window.
2.
Select the module in "Module List" and drag it to the list of stations or the network map.
3.
An assignment setting row is added to the station list, the total number of stations is increased, and the selected module
is added to the network map.
4.
Set items in the station list if necessary.
5.
Click the [Close with Reflecting the Setting] button to complete the setting process and close the window.
• The setting operation can be performed with a general-purpose profile. In that case, select "General
Intelligent Device Station" from the "Module List", and then drag and drop it to the station list or the network
map.
• A module can also be added to the station list by copying and pasting the model name. In addition, multiple
modules can be selected by dragging over model names and copied and pasted collectively. However,
since the same value is pasted for the station numbers, the station numbers must be changed to avoid
duplication.
7 PARAMETER SETTING