Mitsubishi Electric NZ2GN2S1-32D User Manual page 83

Programmable controller cc-link ie tsn remote i/o module
Hide thumbs Also See for NZ2GN2S1-32D:
Table of Contents

Advertisement

Connecting and disconnecting the cable
To connect the cable, fully insert a wire with a bar solderless terminal into a wire insertion opening.
After inserting the wire, pull it lightly to check that it is securely clamped.
(1)
Continuity can be checked with test terminal (1).
Use the following test plug to check continuity.
• PHOENIX CONTACT GmbH & Co. KG test plug (1.0mm): MPS-MT 1-S4-B RD, MPS-MT 1-S
To disconnect the cable, push in the open/close button with a flathead screwdriver.
With the button pushed in, pull out the wire having a bar solderless terminal.
6 INSTALLATION AND WIRING
6.5 Wiring of Terminal Block for Module Power Supply and FG
6
81

Advertisement

Table of Contents
loading

Table of Contents