Mitsubishi Electric NZ2GN2S1-32D User Manual page 112

Programmable controller cc-link ie tsn remote i/o module
Hide thumbs Also See for NZ2GN2S1-32D:
Table of Contents

Advertisement

Synchronous output timing setting control
With the synchronization cycle timing used as reference, set the timing for changing the output.
I/O module
(1) For each synchronization cycle, set the following.
• Synchronous output timing setting Y0 OFF to ON: Sets the timing for turning output on from off.
• Synchronous output timing setting Y0 ON to OFF: Sets the timing for turning output off from on.
(2) The I/O module performs output processing in the next synchronization cycle.
(3) Synchronization cycle
(4) Input
(5) Operation
(6) Output
(7) Synchronous output timing setting Y0 OFF to ON = No OFF to ON, Synchronous output timing setting Y0 ON to OFF = No ON to OFF
(8) Synchronous output timing setting Y0 OFF to ON = No OFF to ON, Synchronous output timing setting Y0 ON to OFF = 800s
(9) Synchronous output timing setting Y0 OFF to ON = 200s, Synchronous output timing setting Y0 ON to OFF = No ON to OFF
(10) Turns on from off 200s later
(11) Turns off from on 800s later
8 FUNCTIONS
110
8.3 CC-Link IE Field Network Synchronous Communication Function
Scan program
Synchronization
control interrupt
(4) (5) (6)
program
External output Y0
OFF
(Status of the Y0
terminal)
(3)
(4) (5) (6)
(4) (5) (6)
(1)
(1)
(9)
(4) (5) (6)
(4) (5) (6)
(7)
(1)
(8)
ON
(10)
(11)
(2)
(4) (5) (6)

Advertisement

Table of Contents
loading

Table of Contents