Facility Pre-Installation Summary; Overview Of Mains Power Supply And Interlocks - Brainlab ExacTrac Planning Manual

With a varian truebeam linear accelerator
Table of Contents

Advertisement

APPENDIX
12.4

Facility Pre-Installation Summary

12.4.1

Overview of Mains Power Supply and Interlocks

Installation Suggestion
This overview provides suggestions on how to fulfill the ExacTrac requirements from the previous
chapters. Local regulatory requirements and your specific needs can lead to a different solution for
implementing power supply switching and interlock inputs and outputs.
The following diagram shows an example of an electrical schematic for the pre-installed power
supply and interlock circuits:
Site Planning Manual Rev. 1.0 ExacTrac Ver. 6.x
Figure 44
109