Remove The Server From The Mounting/Docking Hardware - HPE ProLiant EC200a Maintenance And Service Manual

Managed hybrid server
Table of Contents

Advertisement

Before performing hardware maintenance on one of the servers in a clustered pair, press and
o
release the Power On/Standby button on the server that requires maintenance. This action will
initiate a controlled shutdown of applications and the OS.
In this scenario, the Managed Hybrid Services switches over to the remaining powered on server
to ensure that there is no interruption to normal user operations.
Before moving a clustered pair of servers or when preparing for a planned power outage on the
o
site, press and release the Power On/Standby button on both servers within 30 seconds of each
other. This action will initiate a controlled shutdown of applications and the OS.
The LAN, WAN, and WiFi LEDs on both servers flash to indicate that the server shutdown is in
progress. If the system does not power down after the LAN, WAN, and WiFi LEDs stop flashing,
contact the HPE ProLiant Easy Connect Support (https://support.prolianteasyconnect.com).
Verify that the system power LED on the server or servers where the power button was pressed is
2.
red
("Front panel LEDs and
A red system power LED means that the server is in standby mode. Auxiliary power is still present in
the system in this mode.

Remove the server from the mounting/docking hardware

If the server is installed in a cradle, wall mount, or storage expansion unit:
Remove the server from the cradle (on page 21).
Remove the server from the wall mount (on page 21).
Remove the server from the storage expansion unit (on page 22).
Remove the server from the cradle
Open the latches on the cradle.
1.
Remove the server from the cradle.
2.
Remove the server from the wall mount
Open the wall mount latch.
1.
button" on page 52).
Removal and replacement procedures 21

Advertisement

Table of Contents
loading

Table of Contents