Replacing The Storage Expansion Unit; Replacing A Storage Expansion Drive; Remove A Storage Expansion Drive - HPE ProLiant EC200a Maintenance And Service Manual

Managed hybrid server
Table of Contents

Advertisement

The server exits standby mode and full power is applied to the system.
Verify that the system power LED on the server is white
2.
Power up a clustered system
Press the Power On/Standby button on both servers within 5 minutes of each other.
1.
The servers exit standby mode and full power is applied to the systems.
Verify that the system power LEDs on both servers are white
2.
page 52).

Replacing the storage expansion unit

Process overview:
Prepare the server for hardware replacement (on page 20).
1.
Remove the server from the storage expansion unit (on page 22).
2.
Remove the storage expansion drives
3.
Install the drives in the new storage expansion unit.
4.
Install the drive bay cover.
5.
Install the server on the new storage expansion unit
6.
unit" on page 36).
Prepare the server for operation (on page 28).
7.

Replacing a storage expansion drive

Process overview:
Prepare the server for hardware replacement (on page 20).
1.
Remove the server from the storage expansion unit (on page 22).
2.
Place the storage expansion unit on a flat, level work surface.
3.
Remove the storage expansion drives
4.
Install the new drive in the storage expansion unit.
5.
Install the drive bay cover.
6.
Install the server on the storage expansion unit (on page 36).
7.
Prepare the server for operation (on page 28).
8.

Remove a storage expansion drive

Remove the drive bay cover:
1.
Press the cover release button.
a.
("Front panel LEDs and
("Front panel LEDs and
("Remove a storage expansion
("Install the server on the storage expansion
("Remove a storage expansion
Removal and replacement procedures 38
button" on page 52).
button" on
drive" on page 38).
drive" on page 38).

Advertisement

Table of Contents
loading

Table of Contents