If the battery tray(s) was ordered with the system, wiring to the battery tray was
performed at the factory. If a battery tray is installed in the field, customer must wire to
the battery tray.
Procedure
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy
Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.
)
NPBA
1) Refer to the wiring diagram provided in Figure 4-17, and wire the battery tray for
your application. Refer also to Figure 4-13 or Figure 4-14.