Emerson NetSure 710NPBA Installation Instructions Manual page 73

+24v dc power system
Table of Contents

Advertisement

Installation Instructions
Spec. No. 581127000 (Model 710
List DA (Lists DB, DC, and DD similar.)
Shorting Block if 4th shelf
has Converter Option.
If more than three shelves with the Converter Option
installed, connect /–48/ jumpers for the 4th shelf here.
Assembly order is: lug, 1/4" flat washer, 1/4" lock washer,
1/4-20 nut. Torque to 84 in-lbs. Note that a shorting block
will be factory installed in this distribution device position.
Rear
588705201 Module Mounting Shelf
or Top Shelf in 588705202, 588705203,
or 588705204 Shelf Assembly
588705200 Expansion
Module Mounting Shelf
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy
Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.
)
NPBA
Dual Voltage Distribution Panel
Connect /–48/ jumpers to an available landing here.
Assembly order is: lug, 1/4" flat washer,
1/4" lock washer, 1/4-20 bolt.
Torque to 84 in-lbs.
Connect /–48/ jumpers here.
Assembly order is: lug, 1/4" flat washer,
1/4" lock washer, 1/4-20 nut.
Torque to 84 in-lbs.
Rear
Figure 4-12
Installing Converter Output Cables
Chapter 4. Making Electrical Connections
IM581127000
Issue AB, March 22, 2012
Connect /–48/ jumpers here.
Assembly order is: lug, 1/4" flat washer,
1/4" lock washer, 1/4-20 nut.
Torque to 84 in-lbs.
Page 65

Advertisement

Table of Contents
loading

This manual is also suitable for:

581127000

Table of Contents