Installing A List 93 Battery Tray - Emerson NetSure 710NPBA Installation Instructions Manual

+24v dc power system
Table of Contents

Advertisement

IM581127000
Issue AB, March 22, 2012

Installing a List 93 Battery Tray

Perform the following procedures to install a List 93 Battery Tray.
Danger: The relay rack must be securely anchored to the floor before a battery
Installing a Battery Tray Procedure
Cabling
Bracket
Rear
Angle
Bracket
Page 10
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy
Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.
tray is installed.
1) To install a List 93 Battery Tray, perform the procedure in Figure 2-4.
Battery Tray
Front
Figure 2-4
Installing a List 93 Battery Tray
Chapter 2. Installing the System
Spec. No. 581127000 (Model 710
1. Slide battery tray into relay rack and
secure to relay rack with 12-24 x 3/4"
thread forming hex head screws and
#10/12 ground washers (1 place per
side) or #12 flat washers (3 places per
side). (Torque to 70 in-lbs).
2. Secure rear angle brackets (both sides)
to battery tray with 1/4-20 x 3/4" bolts,
1/4" flat washers, 1/4" lock washers, and
1/4" nuts. (Torque to 84 in-lbs).
3. Secure rear angle brackets (both sides)
to relay rack with 12-24 x 3/4" thread
forming hex head screws and #10/12
ground washers (1 place per bracket)
or #12 flat washers (1 place per bracket).
(Torque to 70 in-lbs).
4. Secure cabling brackets (both sides) to
relay rack with 12-24 x 1/2" thread forming
hex head screws. (Torque to 70 in-lbs).
Rear
Installation Instructions
NPBA
Rear Angle Bracket
)

Advertisement

Table of Contents
loading

This manual is also suitable for:

581127000

Table of Contents