Emerson PACSystems RX3i Quick Start Manual

Hide thumbs Also See for PACSystems RX3i:

Advertisement

Quick Links

QUICK START GUIDE
GFK-2939A
Sep 2019
PACSystems™ RX3i
ENERGY PACK
(IC695ACC402)

Advertisement

Table of Contents
loading

Summary of Contents for Emerson PACSystems RX3i

  • Page 1 QUICK START GUIDE GFK-2939A Sep 2019 PACSystems™ RX3i ENERGY PACK (IC695ACC402)
  • Page 2: Table Of Contents

    Quick Start Guide Contents GFK-2939A Sep 2019 Table of Contents Overview ............2 Ordering Information ............4 Hardware Installation........5 Mounting the Energy Pack on a DIN Rail ......6 Mounting the Energy Pack Directly on a Panel ....7 Installation Location ............
  • Page 3 Quick Start Guide Cautions and Warnings GFK-2939A Sep 2019 Caution, Warnings & Danger Notes as Used in this Publication Warning Notices are used in this publication to emphasize that hazardous voltages, currents, temperatures, or other conditions that could cause personal injury exist in this equipment or may be associated with its use.
  • Page 4 2019 Emerson. All rights reserved. Emerson Terms and Conditions of Sale are available upon request. The Emerson logo is a trademark and service mark of Emerson Electric Co. All other marks are the property of their respective owners. Warnings and Cautions...
  • Page 5: Overview

    Quick Start Guide Chapter 1 GFK-2939A Sep 2019 1. Overview The ACC402 Energy Pack is used exclusively with the CPE330 RX3i CPU. It preserves user memory in the Controller during power fluctuations or outages. If system power is lost, the Energy Pack maintains power long enough for the connected CPE330 to write its user memory contents to non-volatile memory.
  • Page 6 Quick Start Guide Chapter 1 GFK-2939A Sep 2019 Figure 1.1: Connection Diagram Overview...
  • Page 7: Ordering Information

    Quick Start Guide Chapter 1 GFK-2939A Sep 2019 Ordering Information IC695ACC402 CPE330-compatible Energy Pack. Includes Base, Cap Pack module, CPU connecting cable & ground strap. IC695ACC412 Replacement Cap Pack module. IC695CBL002 Replacement 1m (36”) CPU connecting cable. Overview...
  • Page 8: Hardware Installation

    Quick Start Guide Chapter 2 GFK-2939A Sep 2019 2. Hardware Installation The ACC402 Energy Pack may be mounted on a standard EN50022 DIN rail or directly on an equipment panel. It is designed to be mounted adjacent to the CPE330 Controller and connected to the Controller using the 1m cable provided (IC695CBL002).
  • Page 9: Mounting The Energy Pack On A Din Rail

    Quick Start Guide Chapter 2 GFK-2939A Sep 2019 Mounting the Energy Pack on a DIN Rail The Energy Pack snaps easily onto the DIN rail. No tools are required. Figure 2.1: Mounting on to DIN-Rail Hardware Installation...
  • Page 10: Mounting The Energy Pack Directly On A Panel

    Quick Start Guide Chapter 2 GFK-2939A Sep 2019 Mounting the Energy Pack Directly on a Panel Recommended fasteners: The baseplate accommodates four M4-0.7 machine screws (8-36 UNF). Minimum length of 25mm (or 1”) is recommended. Secure with matching nuts. Hardware Installation...
  • Page 11: Installation Location

    NEMA/UL Type 1 enclosure or an IEC60529 IP20 rating providing at least a pollution degree 2 environment. For details about installing RX3i rack systems, refer to PACSystems RX3i System Manual, GFK-2314. If you need technical help, contact Technical Support.
  • Page 12 Quick Start Guide Chapter 2 GFK-2939A Sep 2019 Installation in Hazardous Areas The following information is for products bearing the UL marking for Hazardous Areas or ATEX marking for explosive atmospheres: CLASS 1 DIVISION 2 GROUPS ABCD • This equipment is an open-type device and is meant to be installed in an enclosure suitable for the environment that is only accessible with the use of a tool.
  • Page 13 Quick Start Guide Chapter 2 GFK-2939A Sep 2019 ATEX Zone 2 This module must be mounted in an enclosure certified in accordance with EN60079-15 for use in Zone 2, Group IIC and rated IP54. The enclosure shall only be able to be opened with the use of a tool.
  • Page 14: Cable Connections

    Quick Start Guide Chapter 3 GFK-2939A Sep 2019 3. Cable Connections Figure 3.1: Cable Connection Connecting to the Energy Pack The two connectors on the ACC402 Energy Pack mate with the corresponding two pre-wired pig-tailed connectors of the IC695CBL002 cable assembly. Insert each keyed connector as shown above and secure using the captive screws provided.
  • Page 15: Connecting The Energy Pack To The Controller

    Quick Start Guide Chapter 3 GFK-2939A Sep 2019 Connecting the Energy Pack to the Controller With power to the CPE330 Controller turned off, connect the 7-pin keyed connector of the IC695CBL002 cable assembly to the mating connector on the underside of the IC695CPE330 and secure using the captive screws provided.
  • Page 16: Grounding

    Quick Start Guide Chapter 4 GFK-2939A Sep 2019 4. Grounding Proper grounding of this device is essential. The included ground strap wire must be pressed onto the spade lug connector on the left side of the ACC402. Cable assembly IC695CBL002 ties all internal cable shield drains to this ground.
  • Page 17: Power-Up

    Quick Start Guide Chapter 5 GFK-2939A Sep 2019 5. Power-Up When power is applied to the Energy Pack, the power-up process goes through the following steps: The IN LED turns on green. The Energy Pack performs a self- diagnostic test. If this test passes, output power to the Controller turned on and the OUT LED...
  • Page 18: Led Indications

    Quick Start Guide Chapter 6 GFK-2939A Sep 2019 6. LED Indications State Energy Pack Status Green, Input power is applied and within the specified solid range. Red, solid Input power is outside the specified range. Input power is not applied. STAT Green, Charging of Cap Pack is in progress.
  • Page 19: Firmware Updates

    Quick Start Guide Chapter 7 GFK-2939A Sep 2019 7. Firmware Updates The firmware for the Energy Pack is automatically updated by the Controller. At power-up, the Controller checks the version of Energy Pack firmware to verify compatibility with the Controller firmware. If an update is needed, the Controller performs it automatically.
  • Page 20: Replacing The Cap Pack Module

    The status of the Energy Pack is provided at %S0014 (#PLC_BAT) and %SA0011 (#LOW_BAT). User programs should monitor these status bits in order to alert for maintenance conditions. Refer to PACSystems RX3i CPU Reference Manual, GFK-2222V or later. The Cap Pack may be removed and replaced while power is applied to the Energy Pack (hot swapped.)
  • Page 21 5. To remove a Failed Battery fault and clear the associated status bits, clear Controller Fault Table. For details on user programming based on status bit operation, refer to the PACSystems RX3i CPU Programmer’s Reference Manual, GFK-2950. Replacing the Cap Pack Module...
  • Page 22: Additional Information

    GFK-2939A Sep 2019 9. Additional Information PACSystems RX3i Power Sync and Measurement System, GFK-2748 PACSystems RX3i 1GHz 64MB CPU w/Ethernet Quick Start Guide, GFK-2941A PACSystems Controllers: Battery and Energy Pack Manual, GFK-2741C or later PACSystems RX3i Energy Pack IC695ACC402 Important...
  • Page 23: General Contact Information

    We reserve the right to modify or improve the designs or specifications of the products mentioned in this manual at any time without notice. Emerson does not assume responsibility for the selection, use or maintenance of any product. Responsibility for proper selection, use and maintenance of any Emerson product remains solely with the purchaser.

This manual is also suitable for: