20.2.7 Cooling pump connection map

About
Connect the pump cables in the following order: Pump 1 connected to Connector 1 and so on...
Image 20-27
In order to activate the new thermal conductive change material (gasket) used on the laser clusters, the unit
should be kept with lasers running at full power for 1 hr.

20.3 40000 hours service

The 40.000 hours service comprises the following parts, in addition to the parts included in the 20.000 hr. service: