Image 20-25
20.2.7 Cooling pump connection map
About
Connect the pump cables in the following order: Pump 1 connected to Connector 1 and so on...
Image 20-27
In order to activate the new thermal conductive change material (gasket) used on the laser clusters, the unit
should be kept with lasers running at full power for 1 hr.
20.3 40000 hours service
The 40.000 hours service comprises the following parts, in addition to the parts included in the 20.000 hr. service:
723–0016 F90 01/12/2017
Image 20-26
20. Scheduled operations