Autoboom Xrt Advanced Tuning; Preparation; Sensor Dimensions; Boom Angle Sensor - Raven New Holland AutoBoom XRT Calibration & Operation Manual

Table of Contents

Advertisement

CHAPTER
6

PREPARATION

SENSOR DIMENSIONS

Verify the system dimensions are entered correctly for height sensor offsets and center rack width.

BOOM ANGLE SENSOR

Ensure the automated calibration sequence is performed over flat ground. If the sensor dimensions were updated,
re-perform the boom angle sensor calibration.

BASE CONTROL EFFORT CALIBRATION

Accurate base control effort values are necessary for successful advanced tuning. Only perform a Base Control
Effort Calibration after warming the hydraulic oil. If possible, engage AutoBoom and drive slowly for two minutes
prior to performing Base Control Effort calibration. This will ensure the Solenoid coils are at operating temperature
and will give the most accurate Base Control Effort.

HYDRAULIC OIL

For best results, perform tuning with the hydraulic oil at normal operating temperature.
016-0235-010 Rev. B
A UTOBOOM XRT ADVANCED
C H A P T E R 6
TUNING
47

Advertisement

Table of Contents
loading

Table of Contents