Equipotential bonding according to the grounding concept

The walkable installation and operating surface of the chamber must be conductive. This installation and
operating surface must be connected to the vacuum drying oven according to the grounding concept
(chap. 6.6). Cyclic measurements of the equipotential bonding are required.
Explosion hazard by electric sparking due to missing or improperly implemented
equipotential bonding.
Serious injury or death from burns and / or explosion pressure.
 Connect all equipment elements in the installation and operating area (VDL / pump
module / pump) with the conductive surface and/or with each other. Proceed according
to the grounding concept (Chap. 6.6).
 Measure the equipotential bonding prior to commissioning the equipment.
 Provide cyclic measurements of the equipotential bonding.
1.7.1.4

Accessibility to the disconnection from the power grid

To completely separate the chamber from the power supply, you must disconnect the power plug. Install
the chamber in a way that the power plug is easily accessible and can be easily pulled in case of danger.
1.7.1.5

Technical ventilation (extraction)

The operator shall provide active extraction (technical ventilation according to country-specific regulations
(TRBS 2152 Part 2 for Germany) before commissioning the chamber. Extraction must include the entire
installation area of the vacuum drying oven and a vacuum pump; in addition, extraction must be provided
on the floor behind the chamber. Extraction must be active during the entire chamber operation. Operati-
on, loading and unloading of the loading material and removal of the filled condensate catchpot of the
pump must always take place under technical ventilation. If the technical ventilation fails, automatically
switch off power to the chamber.
This will prevent spreading of an explosive atmosphere to unprotected areas (see chap. 3.6).
Explosion hazard due to the spread of an explosive atmosphere to unprotected
areas and ignition due to electric sparking or hot surfaces.
Serious injury or death from burns and / or explosion pressure.
 Provide active suction (technical ventilation according to country-specific regulations
(TRBS 2152 Part 2 for Germany) prior to commissioning the chamber.
 Extraction must include the entire installation area of the vacuum drying oven; in additi-
on, extraction must be provided on the floor behind the chamber.
 Make sure that the chamber is automatically turned off if the technical ventilation fails.
VDL (E3) 09/2019
DANGER
DANGER
Page 18/234

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vdl 23Vdl 23-ulVdl 56Vdl 56-ulVdl 115Vdl 115-ul

Table of Contents