Unloading The Loading Material - Binder VDL Series Operating Manual

Vacuum drying oven
Hide thumbs Also See for VDL Series:
Table of Contents

Advertisement

Hazard when opening the door after ventilation: After incorrect loading, open the door only when the
inner temperature has sunk to ambient temperature.
Prior to a termination of a not completed drying process make sure that the auto-ignition tem-
peratureof the solvent has been determined correctly, and that the drying temperature
reached far below this. In case of doubt, do not interrupt the drying process!
Proceeding to terminate the drying process:
• Set the temperature set-point to approx. ambient temperature
• the chamber cool down to ambient temperature
• Set the pressure set-point to approx atmosheric pressure
Explosion hazard through the formation of an explosive atmosphere in the presence
of hot surfaces after incorrect loading
Serious injury or death from burns and / or explosion pressure.
∅ Do NOT use ambient air to break the vacuum as long as the chamber is hot. Do NOT
remove the "Manual ventilation" plug as long as the drying process is still running,.
 Let the chamber cool down to room temperature before opening the door.
9.10

Unloading the loading material

Do not unload the loading material without technical ventilation.
Note the following points before unloading the loading material:
When unloading the loading material also in the context of intended use, an explosive mixture may form
in the working space. Therefore, a safety area of min. 1 m in front of the oven must be considered.
• Activate Standby mode on the controller before opening the door.
• Ensure equipotential bonding: The accessible installation and operating area in front of the equipment
must be conductive. This installation and operating area must be connected to the vacuum drying
oven and other equipment according to the grounding plan (chap. 6.6).
• Activate the technical ventilation (extraction):
The operator shall provide active extraction (technical ventilation according to country-specific regula-
tions – TRBS 2152 Part 2 for Germany) prior to commissioning the oven. Extraction must include the
entire installation area of the vacuum drying oven; in addition, extraction must be provided on the floor
behind the chamber. Unloading the loading material must take place in the safety area in front of the
oven with technical ventilation.
• The personal protective equipment (PPE) of the operating personnel must be implemented
ESDprotected.
• Sweep the area for electrical equipment at least 15 minutes with compressed air or inert gas.
VDL (E3) 09/2019
DANGER
Page 101/234

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vdl 23Vdl 23-ulVdl 56Vdl 56-ulVdl 115Vdl 115-ul

Table of Contents