Installing Fans; Installing Interconnect Modules - HPE Synergy 12000 Frame Setup And Installation Manual

Hide thumbs Also See for Synergy 12000 Frame:
Table of Contents

Advertisement

Installing fans

All ten fans must be populated at all times. There is no required installation order for installing the fans.
To install a fan, insert the fan into the frame until it locks into place.
CAUTION: Use caution to avoid hitting the PCA card edge against the frame. Damage to the fan
PCA could result in malfunction of the fan or the frame.
After power is applied to the frame, verify each fan LED is green.

Installing interconnect modules

There are six single-wide interconnect bays in the frame. Installation in the interconnect bays depends on
the type of mezzanine card installed in the compute module and in which mezzanine slot the mezzanine
card was installed.
IMPORTANT: If the mezzanine card is not installed properly or the interconnect module installation
does not coincide with the mezzanine card installation, the ports on the interconnect module will not
function.
NOTE: For more information on how and where to install mezzanine cards, see the compute module user
guide or the system configuration guide.
Procedure
1. Review the interconnect mapping before selecting the ICM bay to install the interconnect module.
2. If installed, remove the interconnect blank.
44
Installing fans

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents