Verify System And Turn-Up; Ntp-100 Verify System And Turn-Up - Alcatel-Lucent 1677 SONET Link Manual

Turn-up
Hide thumbs Also See for 1677 SONET Link:
Table of Contents

Advertisement

3EM13850AD
Issue 01, September 2007
Non-trouble Procedures (NTPs)
NTP-100

Verify System and Turn-Up

PURPOSE
This procedure is used to verify and turn-up the system.
GENERAL
The following nontrouble-clearing procedure verifies proper hardware and software operation before
placing the 1677 SONET Link into operation.
Step details are in Detailed Level Procedures (DLPs). Checklists (CKLs) are provided to record and
mark off steps accomplished.
The referenced procedures presume the equipment and system hardware installation was performed
and verified in accordance with established procedures.
Use this procedure for turn-up of a 1677 SONET Link only. If performing an upgrade, use
documentation provided with software release kit.
STEP
PROCEDURE
Preparation
Get office record.
1
Record site-specific information.
2
Read turn-up test plan.
3
Review safety awareness information.
4
Use static-sensitive device handling procedures.
5
Perform overall visual inspection.
6
Verify System and Turn-Up
For details, refer to
DLP-100
For details, refer to site configuration documentation.
For details, refer to Introduction, Section
For details, refer to Introduction, Section
For details, refer to
DLP-101
and CKL-100.
2.
3.
and CKL-101.
NTP-100
3-1