Confirm Cabling Between Client-Side I/O And Customer Lgx Panel; (Ocn-Equipped Shelf) - Alcatel-Lucent 1677 SONET Link Manual

Turn-up
Hide thumbs Also See for 1677 SONET Link:
Table of Contents

Advertisement

3EM13850AD
Issue 01, September 2007
DLP-116

Confirm Cabling Between Client-Side I/O and Customer LGX Panel

(OCn-Equipped Shelf)

PURPOSE
This procedure is used to confirm fiber-optic cabling between the client side of the system I/O and
the customer LGX panel.
GENERAL
For information on TL1 command syntax, refer to the 1677 SONET Link Commands and Messages
manual (PN 3EM13852AF).
Refer to the 1677 SONET Link Address and Location Guide (PN 3EM13854AD) for rack, shelf, and
module locations.
Use
CKL-108
and
CKL-109
REQUIRED EQUIPMENT
Optical power meter (with FC ports)
SC-to-FC adapter cables
LC-to-FC adapter cables
Optical Attenuators (10 dB)
STEP
PROCEDURE
1
DANGER: Possibility of personal injury. Use of controls or adjustments or
performance of procedures other than those specified herein may result in
hazardous radiation exposure.
2
CAUTION: Possibility of service interruption. Use this procedure for initial turn-up of a
system only. Never use this procedure on a traffic-carrying system. When working with a
traffic-carrying system, refer to the 1677 SONET Link Maintenance and Trouble Clearing
manual (PN 3EM13853AF).
Enter
3
provisioning order.
where:
n=3, 12, 48, or 192
AID=access identifier of OC-n.
Confirm Cabling Between Client-Side I/O and Customer LGX Panel (OCn-Equipped Shelf)
with this procedure.
for one OC-n on an OCn module. Refer to
ENT-OCn::AID;
DLP-116
CKL-109
for
4-61

Advertisement

Table of Contents
loading

Table of Contents