Alcatel-Lucent 1677 SONET Link Manual page 165

Turn-up
Hide thumbs Also See for 1677 SONET Link:
Table of Contents

Advertisement

3EM13850AD
Issue 01, September 2007
For each VSC in slot 5A, 12A, 5B, and 12B that is IS,WKG, enter
68
SW-TOWKG-EQPT::AID;
where:
AID=access identifier of IS,WKG VSC
Enter
69
where:
AID=access identifier of VSC switched in step
Enter
70
where:
AID=access identifier of mate VSC
Are VSCs in slots 6A, 13A, 6B, and 13B IS,WRK and VSCs in slots 5A, 12A, 5B, and
71
12B IS,STBYH?
Refer to 1677 SONET Link Maintenance and Trouble Clearing manual
72
(PN 3EM13853AF) to clear trouble.
Is trouble cleared?
73
Were STS-1s provisioned in step 20?
74
Enter
75
where:
FROM=Refer to tables
TO=Refer to tables
STS-1 port, as shown in tables
already being used in another cross-connection, TO STS-1 port = next available STS-1
port in shelf.
Example:
ENT-CRS-STS1::STS1-3-A-3-1,STS1-3-A-4-1:::2WAY;
Repeat step
76
Set Up GIGE and OCn Modules for Error-Free Verification Tests
for each VSC that was switched in step 68.
RTRV-EQPT::AID;
for mate of each VSC that was switched in step 68.
RTRV-EQPT::AID;
If yes, go to step 74.
If no, go to step 72.
If yes, go to step 66.
If no, go to step 72.
If yes, go to step 75.
If no, go to step 77.
ENT-CRS-STS1::FROM,TO:::2WAY;
121-J
121-J
through
75
until all daisy chain connections have been made for all OCn modules.
68
to establish STS-1 cross-connections.
through
121-M
for daisy chain provisioning order.
121-M
for daisy chain provisioning order. If TO
121-J
through 121-M, is not populated in shelf or is
DLP-121
4-121

Advertisement

Table of Contents
loading

Table of Contents