Alcatel-Lucent 1677 SONET Link Manual page 41

Turn-up
Hide thumbs Also See for 1677 SONET Link:
Table of Contents

Advertisement

3EM13850AD
Issue 01, September 2007
Configure timing source.
17
Create clean database backup.
18
Provision equipment.
19
System Verification
Test module LEDs.
20
Provision DS3/EC1 facilities and verify cabling between client side of system I/O and
21
customer DSX panel.
Provision OC-n facilities and verify cabling between client side of system I/O and
22
customer LGX panel.
Provision GigE facilities and verify cabling between client side of system I/O and
23
customer LGX panel.
Provision OFA facilities and verify cabling between client side of system I/O and
24
customer LGX panel.
Set up ECCs for error-free verification tests.
25
Set up GIGE and OCn modules for error-free verification tests.
26
Verify copy 0 CCCs, SSCs, and TCs are active.
27
Verify System and Turn-Up
For details, refer to DLP-111.
For details, refer to DLP-112.
For details, refer to DLP-113.
For details, refer to
DLP-114
For details, refer to DLP-115, CKL-106, and CKL-107.
For details, refer to DLP-116, CKL-108, and CKL-109.
For details, refer to DLP-118, CKL-110, and CKL-111.
For details, refer to
DLP-119
For details, refer to
DLP-120
For details, refer to DLP-121, CKL-109, and CKL-111.
For details, refer to DLP-122.
and CKL-105.
and CKL-112.
and CKL-107.
NTP-100
3-3

Advertisement

Table of Contents
loading

Table of Contents