Alcatel-Lucent 1677 SONET Link Manual page 188

Turn-up
Hide thumbs Also See for 1677 SONET Link:
Table of Contents

Advertisement

DLP-125
Do conditions exist that prevent testing?
5
Clear all conditions that prevent testing, verify in CKL-115, then go to step 7. Refer to
6
1677 SONET Link Maintenance and Trouble Clearing manual (PN 3EM13853AF).
CCC Copy Switching
7
RTRV-EQPT::CCC-9;
Enter
8
Observe output. Is CCC in slot 9 IS,WRK and CCC in slot 10 IS,STBYH.
9
Reset test set error count to zero.
10
Enter
11
Enter
12
Enter
13
Did CCCs change states (CCC in slot 9 is IS,STBYH and CCC in slot 10 is IS,WKG)?
14
Refer to 1677 SONET Link Maintenance and Trouble Clearing manual
15
(PN 3EM13853AF) to clear trouble.
Is trouble cleared?
16
Are errors reported?
17
Refer to 1677 SONET Link Maintenance and Trouble Clearing manual
18
(PN 3EM13853AF) to determine source of error before going to next step.
4-144
If yes, then go to step 6.
If no, verify in CKL-115, go to step 7.
to retrieve equipment parameters of copy 0 CCC.
RTRV-EQPT::CCC-10;
If yes, go to step 10.
If no, refer to DLP-122, then go to step 7.
SW-DX-EQPT::CCC-9;
RTRV-EQPT::CCC-9;
RTRV-EQPT::CCC-10;
If yes, go to step 17.
If no, go to step 15.
If yes, go to step 17.
If no, go to step 15.
If yes, go to step 18.
If no, record information in CKL-115, then go to step 21.
to retrieve equipment parameters of copy 1 CCC.
Verify Clock and Control Subsystem Switching
3EM13850AD
Issue 01, September 2007

Advertisement

Table of Contents
loading

Table of Contents