3EM13850AD
Issue 01, September 2007
CKL-116
Verify DS0G, TMUX, and VSC Switching (Working to Protect)
Use this checklist for DLP-126.
Refer to tables
116-A
verified during procedure.
DESCRIPTION
No alarms that prevent testing are present.
No conditions that prevent testing are present.
Table 116-B. Verify TMUX, and VSC Switching (Working to Protect)
TMUX, OR VSC LOCATION
(SLOT-SUBSLOT)
6-A
13-A
6-B
13-B
DS0G LOCATION (SLOT-
SUBSLOT)
3-AB
14-AB
Verify DS0G, TMUX, and VSC Switching (Working to Protect)
through
116-C
and place a check (✓) in the VERIFIED column as each item is
Table 116-A. Verify No Alarms or Conditions
SWITCH TO PROTECT
VERIFIED (✓)
Table 116-C. Verify DS0G Switching (Working to Protect)
SWITCH TO PROTECT
VERIFIED (✓)
CKL-116
VERIFIED (✓)
ERROR FREE VERIFIED (✓)
ERROR FREE VERIFIED (✓)
5-91