Installing The Air Baffle - IBM Storwize V7000 Unified Problem Determination Manual

Table of Contents

Advertisement

2.
3. Remove the cover. For more information, see Removing the cover.
4. If there is any full-height, full-length card, remove riser-card assembly 1. For
5. Place your fingers under the front and back of the top of the air baffle, and

Installing the air baffle

The following procedure is for a Tier 1 customer replaceable unit (CRU).
Replacement of Tier 1 CRUs is your responsibility. If IBM installs a Tier 1 CRU at
your request, you will be charged for the installation. Service agreements can be
purchased so that you can ask IBM to replace these units.
About this task
To install the DIMM air baffle, complete the following steps.
Air baffle
Figure 60. Installing the air baffle
Procedure
1. Read the safety information that begins on page Safety and "Installation
138
Storwize V7000 Unified: Problem Determination Guide 2073-720
Follow the procedure in "Removing a file module and disconnecting power"
on page 92 to suspend the file module from the cluster and shut it down and
disconnect all power cords and external cables.
more information, see Removing a PCI riser-card assembly.
then lift the air baffle out of the file module.
Attention: For proper cooling and airflow, replace all the air baffles before
you turn on the file module. If you operate the file module with any air baffle
removed, it might cause damages to the file module components.
guidelines" on page 94.
PCI riser-card
assembly 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Storwize V7000 Unified and is the answer not in the manual?

Table of Contents

Save PDF