Chapter 2
Use the following basic sequence of steps to install the Integrated Accessory
Cabinet-Distribution (IAC-D).

2.1 Creating an Installation Plan

Before installing the IAC-D, read and understand how this manual applies to the system
being installed. Use the procedures and illustrations in the following chapters to create a
logical plan for installing the system.

2.2 Preparing the Site

For the IAC-D to operate at peak efficiency, the installation site should meet the
environmental parameters outlined in this manual. If the IAC-D is to be operated at an
altitude higher than 1500m (5000 ft), contact your Eaton service representative for
important information about high altitude operation. The operating environment must
meet the weight, clearance, and environmental requirements specified in Drawing
164201591-2 on page A-4 and size requirements specified on Drawing 164201591-9
starting on page A-27.
The IAC-D uses natural convection cooling to regulate internal component temperature.
Air inlets are in the front of the cabinet and outlets are in the top (see Drawing
164201591-9 starting on page A-27). Clearance must be allowed in front and above each
IAC-D, and the front of the cabinet must be free of any obstructions for proper air
circulation. See Drawing 164201591-2 on page A-4 for clearances.
EATON Powerware
9390 IAC-D Installation and Operation Manual S 164201591 Rev B powerware.com
®

IAC-D Installation Plan and Unpacking

1. Create an installation plan for the IAC-D (Chapter 2).
2. Prepare your site for the IAC-D (Chapter 2).
3. Inspect and unpack the IAC-D (Chapter 2).
4. Unload and install the IAC-D and wire the system (Chapter 3).
5. Complete the Installation Checklist (Chapter 3).
6. Have authorized service personnel perform preliminary operational checks and
startup.
Startup and operational checks must be performed by an authorized Eaton
NOTE
Customer Service Engineer, or the warranty terms as specified on page W-1 become
void. This service is offered as part of the sales contract for the UPS system. Contact
service in advance (usually a two-week notice is required) to reserve a preferred startup
date.