Eaton Powerware 9390 IAC-D Installation And Operation Manual page 20

Integrated accessory cabinet
Table of Contents

Advertisement

Installing the IAC-D
2. Unfasten the front door latch and swing the door open (see Figure 3-1).
3. Remove the door. Remove the retaining screws located inside the door at the top
4. If the leveling feet are not fully retracted, turn the leveling feet until they are
5. Remove the two bolts securing the front shipping bracket to the pallet (see
6. Remove the four bolts securing the rear shipping bracket to the cabinet and the
7. Remove the three rear skid bolts securing the removable skid and remove the skid
NOTE
rolled beyond the the center of the pallet. Be sure to restrain the cabinet as it continues
to roll down the pallet/ramp. The front shipping bracket will act as a brake to assist
restraining the cabinet.
Do not stand directly behind the pallet while unloading the cabinet. If unloading instructions
are not closely followed, the cabinet may cause serious injury.
8. Slowly roll the cabinet toward the rear of the pallet. Once the pallet tilts, continue
9. Remove the four bolts securing the front shipping bracket to the cabinet (see
10. Discard or recycle the pallet and unused shipping brackets in a responsible
11. Roll the cabinet to its final installation location.
12. Proceed to paragraph 3.3.
3-2
EATON Powerware
and bottom hinge pivot points, then lift the door off. Save the retaining screws for
reinstallation of the door.
retracted.
Figure 3-1). Do not remove the four bolts securing the bracket to the cabinet.
two bolts securing the bracket to the pallet (see Figure 3-2). Remove the rear
shipping bracket. If installing the cabinet permanently, retain the shipping bracket
and securing hardware for later use.
(see Figure 3-2).
In the following step the pallet will tilt and act as a ramp when the cabinet is
rolling the cabinet down the pallet until the cabinet is clear of the pallet.
Figure 3-1). Remove the front shipping bracket. If installing the cabinet
permanently, retain the shipping bracket and securing hardware for later use.
manner.
9390 IAC-D Installation and Operation Manual S 164201591 Rev B powerware.com
®
W A R N I N G

Advertisement

Table of Contents
loading

Table of Contents