Eaton Powerware 9390 IAC-D Installation And Operation Manual page 71

Integrated accessory cabinet
Table of Contents

Advertisement

DISTRIBUTION PANEL
OUTPUT GROUND
TERMINALS (E18)
DISTRIBUTION PANEL
OUTPUT NEUTRAL
TERMINALS (E10)
OPTIONAL DISTRIBUTION
PANEL PB1 INPUT
BREAKER CB20
DISTRIBUTION PANEL PB2
INPUT BREAKER CB10
DISTRIBUTION PANEL
OUTPUT NEUTRAL
TERMINALS (E20)
DISTRIBUTION PANEL
OUTPUT GROUND
TERMINALS (E28)
GROUND TERMINAL (E9)
208V/120V OUTPUT DISTRIBUTION PANEL OPTION IAC---D
NOTE: Metal shields covering wiring terminals
must be removed or opened to gain
access to terminals.
EATON Powerware
9390 IAC-D Installation and Operation Manual S 164201591 Rev B powerware.com
®
DESCRIPTION:
IAC-- D POWER TERMINAL LOCATIONS
DRAWING NO:
164201591---8
REVISION:
A
Installation Information
DISTRIBUTION PANEL
OUTPUT GROUND
TERMINALS (E19)
OPTIONAL 225A
DISTRIBUTION PANEL PB1
(USE CUTLER-HAMMER
BOLT-ON TYPE BAB OR QBHW
BREAKERS, OR PLUG-ON
TYPE HQP OR QPHW
BREAKERS)
DISTRIBUTION PANEL
OUTPUT NEUTRAL
TERMINALS (E10)
DISTRIBUTION PANEL
OUTPUT NEUTRAL
TERMINALS (E20)
225A DISTRIBUTION PANEL
PB2 (USE CUTLER-HAMMER
BOLT-ON TYPE BAB OR
QBHW BREAKERS, OR
PLUG-ON TYPE HQP OR
QPHW BREAKERS)
DISTRIBUTION PANEL
OUTPUT GROUND
TERMINALS (E29)
AC INPUT FROM UPS
(A, B, C)
(SEE SHEET 5 of 6
FOR DETAILS)
SHEET:
1 of 6
DATE:
051505
A-21

Advertisement

Table of Contents
loading

Table of Contents