Eaton Powerware 9390 IAC-D Installation And Operation Manual page 73

Integrated accessory cabinet
Table of Contents

Advertisement

40---100A OR 100---250A
ADJUSTABLE
DISTRIBUTION
BREAKERS
(CB11, CB12, CB13)
40---100A OR 100---250A
ADJUSTABLE
DISTRIBUTION
BREAKERS
(CB21, CB22, CB23)
GROUND TERMINAL (E9)
208V OR 480V OUTPUT DISTRIBUTION BREAKER OPTION IAC---D
NOTE: Metal shields covering wiring terminals
must be removed or opened to gain
access to terminals.
EATON Powerware
9390 IAC-D Installation and Operation Manual S 164201591 Rev B powerware.com
®
DESCRIPTION:
IAC-- D POWER TERMINAL LOCATIONS
DRAWING NO:
164201591---8
REVISION:
A
Installation Information
OUTPUT NEUTRAL
TERMINALS (E10)
AC OUTPUT
(C, B, A) (EACH BREAKER)
(SEE SHEET 6 of 6
FOR DETAILS)
OUTPUT GROUND
TERMINALS (E18, E19)
OUTPUT GROUND
TERMINALS (E28, E29)
OUTPUT NEUTRAL
TERMINALS (E20)
AC OUTPUT
(C, B, A) (EACH BREAKER)
(SEE SHEET 6 of 6
FOR DETAILS)
AC INPUT FROM UPS
(A, B, C)
(SEE SHEET 5 of 6
FOR DETAILS)
SHEET:
3 of 6
DATE:
051505
A-23

Advertisement

Table of Contents
loading

Table of Contents