Initial Startup; Completing The Installation Checklist - Eaton Powerware 9390 IAC-D Installation And Operation Manual

Integrated accessory cabinet
Table of Contents

Advertisement

Installing the IAC-D

3.4 Initial Startup

Startup and operational checks must be performed by an authorized Eaton Customer
Service Engineer, or the warranty terms as specified on page W-1 become void. This service
is offered as part of the sales contract for the UPS system. Contact service in advance
(usually a two-week notice is required) to reserve a preferred startup date.

3.5 Completing the Installation Checklist

The final step in installing the IAC-D is completing the following Installation Checklist. This
checklist ensures that you have completely installed all hardware, cables, and other
equipment. Completing all items listed on the checklist will ensure a smooth installation.
Make a copy of the Installation Checklist before filling it out, and retain the original.
After the installation is complete, a service representative will be able to verify the
operation of the UPS system and commission it to support the critical load. The service
representative cannot perform any installation tasks other than verifying software and
operating setup parameters. Service personnel may request a copy of the completed
Installation Checklist to verify all applicable equipment installations have been completed.
NOTE
for the first time.
3-14
The Installation Checklist MUST be completed prior to starting the UPS system
EATON Powerware
9390 IAC-D Installation and Operation Manual S 164201591 Rev B powerware.com
®