Figure 3-6. 160 Kva Ups To Iac-D Joining Brackets - Eaton Powerware 9390 IAC-D Installation And Operation Manual

Integrated accessory cabinet
Table of Contents

Advertisement

EATON Powerware
9390 IAC-D Installation and Operation Manual S 164201591 Rev B powerware.com
®
Two cabinet joining brackets are provided in the optional field kit for securing
NOTE
each cabinet at the top and bottom. A small flat bracket joins the top of the cabinets and
a larger flat bracket joins the cabinets at the bottom. The small flat bracket is attached
to the cabinet tops first.
30. Locate the small flat bracket from the field kit. Align the holes in the small flat
bracket over the door hinge screw holes. Replace the screws in the hinges,
securing the bracket to the cabinets (see Figure 3-6).
31. Locate the large flat bracket from the field kit. Place one end of the bracket over
the bolt on the bottom side of the lower right-hand hinge on the UPS cabinet and
the other end over the bolt on the bottom side of the lower hinge on the IAC-D
(see Figure 3-6).
32. Secure the bracket to the hinges with the large nuts from the field kit.
33. Proceed to paragraph 3.3.3.
Bracket
from Kit
UPS
Bracket from Kit
UPS
Existing Hinge

Figure 3-6. 160 kVA UPS to IAC-D Joining Brackets

Existing Screws
Top View with Small Bracket
Nuts from Kit
Front View with Large Bracket
Installing the IAC-D
IAC-D
IAC-D
Existing Hinge
3-9

Advertisement

Table of Contents
loading

Table of Contents