Eaton Powerware 9390 IAC-D Installation And Operation Manual page 72

Integrated accessory cabinet
Table of Contents

Advertisement

Installation Information
DISTRIBUTION PANEL
OUTPUT GROUND
TERMINALS (E18)
DISTRIBUTION PANEL
OUTPUT NEUTRAL
TERMINALS (E10)
DISTRIBUTION PANEL PB1
INPUT BREAKER CB10
40---100A OR 100---250A
ADJUSTABLE
DISTRIBUTION
BREAKERS
(CB21, CB22, CB23)
GROUND TERMINAL (E9)
NOTE: Metal shields covering wiring terminals
must be removed or opened to gain
access to terminals.
A-22
208V/120V OUTPUT DISTRIBUTION PANEL AND
208V DISTRIBUTION BREAKER OPTION IAC---D
EATON Powerware
9390 IAC-D Installation and Operation Manual S 164201591 Rev B powerware.com
®
DESCRIPTION:
IAC-- D POWER TERMINAL LOCATIONS
DRAWING NO:
164201591---8
REVISION:
A
DISTRIBUTION PANEL
OUTPUT GROUND
TERMINALS (E19)
225A DISTRIBUTION PANEL
PB1 (USE CUTLER-HAMMER
BOLT-ON TYPE BAB OR
QBHW BREAKERS, OR
PLUG-ON TYPE HQP OR
QPHW BREAKERS)
DISTRIBUTION PANEL
OUTPUT NEUTRAL
TERMINALS (E10)
OUTPUT GROUND
TERMINALS (E28, E29)
OUTPUT NEUTRAL
TERMINALS (E20)
AC OUTPUT
(C, B, A) (EACH BREAKER)
(SEE SHEET 6 of 6
FOR DETAILS)
AC INPUT FROM UPS
(A, B, C)
(SEE SHEET 5 of 6
FOR DETAILS)
SHEET:
2 of 6
DATE:
051505

Advertisement

Table of Contents
loading

Table of Contents